15 HL Bar Brewery Equipment
- Apr 24, 2020
- 106
- brewing
15 HL Bar Brewery Equipment
Brief introduction
Bar brewery equipment volume usually is from 2 HL to 15 HL. If the beer output is below 2 HL per day, usually there is not too much profit left. Bar beer equipment appearance can be stainless steel or red copper or brass.The red copper brewery equipment is more beautiful and luxurious .Starting a brewery business plan,If budget is tight,stainless steel is also a better choice. Bar brewing equipment could be placed behind a glass so that it could allows the visitors observe beer brewing process. It can brew various beers, such as Ale, large etc.
Quick overview of 15 HL Bar brewery equipment
Main configuration of 15 HL Bar brewery equipment
Contact us immediately to get latest specification and price of 15 HL brewery equipment.
Brief introduction
Bar brewery equipment volume usually is from 2 HL to 15 HL. If the beer output is below 2 HL per day, usually there is not too much profit left. Bar beer equipment appearance can be stainless steel or red copper or brass.The red copper brewery equipment is more beautiful and luxurious .Starting a brewery business plan,If budget is tight,stainless steel is also a better choice. Bar brewing equipment could be placed behind a glass so that it could allows the visitors observe beer brewing process. It can brew various beers, such as Ale, large etc.
Quick overview of 15 HL Bar brewery equipment
Output/Brew |
15 HL |
Brew/day |
1-2 |
Output/Week |
15HL to 30HL beer per week based on different configuration |
Electric Supply |
3phase/380(220, 415,440…)v/50 (60)Hz Single Phase/ 220(110, 240…)v/50(60)Hz |
Heating Source |
Electric/Steam/direct fire heating |
Area Request |
>60M2 |
Brewmaster |
1 |
Mashing method | Decoction,infusion,multi-step infusion |
Main configuration of 15 HL Bar brewery equipment
Main brewing system |
Components |
Main specification |
Brewhouse unit |
Mash/lauter tun |
15 HL 25% head space, Steam heating with insulation False bottom, Rake&motor, Spent grain outlet CIP, sight glass. |
Kettle/whirlpool tun |
15 HL 30% head space, Steam heating with insulation Steam condenser, Tangential inlet. Wort outlet and trub outlet |
|
Hot liquor tank |
15HL 15% head space, Steam heating with insulation CIP. Level gauge Hot water recycling port |
|
Wort pump | 3T/hr, Sanitary | |
Hot liquor pump | 3T/hr, Sanitary | |
Plate heat exchanger |
15m2 Two stages Connected with wort aeration device Disassemble |
|
Work platform |
Disassemble, Adjustable |
|
OPTIONAL |
Wort grant Hopback Hopper Pneumatic valve Wort flow meter Sink Sterile air compressor |
|
Fermentation unit |
Fermentation tank |
15 HL/30 HL 25% head space, Jacketed and insulated Conical bottom, Pressure valve, relief valve CO2 relief valve Coolant inlet and outlet Sample valve Side manway Top, Dry Hopping Port CIP connections Wort inlet and yeast outlet Racking arm Temperature and pressure gauges |
Maturation/Storage (OPTIONL) |
Bright beer tank |
15 HL/30 HL 20% head space, Jacketed and insulated Dished head&bottom Pressure valve, relief valve Site Glass level Carbonation stone assembly Sample valve Side manway Fill/drainage port CIP connections Temperature and pressure gauges Jacketed and single wall tanks |
Glycol cooling system |
Glycol cooling tank |
Thermowell Top manway CIP arm and spray ball 360 degree of coverage |
Cold liquor tank (OPTIONAL) |
Thermowell Top manway CIP arm and spray ball 360 degree of coverage Visual level sight glass Cooling jackets |
|
Chiller |
Second generation Freon R410A, R404A |
|
Glycol water pump and piping | ||
Controlling unit |
Brewhouse control panel |
Temperature monitoring& controlling Pump on/off control VFD control |
Cellar control panel |
Temperature monitoring& controlling More controllers reversing for expansion available |
|
Cleaning unit |
Alkali tank |
100L Electric heating |
Sterile tank | 100L | |
Pump and piping |
Contact us immediately to get latest specification and price of 15 HL brewery equipment.