Brief introduction
Hotel Beer Brewing System is same with bar beer brewing equipment capacity from 200L to 2000L.Some chain hotels may need a bigger capacity.The hotel beer brewing system also have stainless steel or red copper one.Most hotel placed the beer equipment behind of the glass wall,so that visitors could watching the brewing process:Milling, mashing, lauterung, boiling, whirlpool, wort chilling, fermentation&maturing, cooling, temperature controlling, cleaning, filling etc..
Quick overview of 20HL Hotel Beer Brewing System
Output/Brew |
20HL |
Brew/day |
1-2 |
Output/Week |
40HL to 200HL beer per week based on different configuration |
Electric Supply |
3phase/380(220, 415,440…)v/50 (60)Hz Single Phase/ 220(110, 240…)v/50(60)Hz |
Heating Source |
Electric/Steam/direct fire heating |
Area Request |
>60M2 |
Brewmaster |
1 |
Mashing method | Decoction,infusion,multi-step infusion |
Configuration list for 20HL Hotel Beer Brewing System
Main brewing system |
Components |
Main specification |
Brewhouse unit |
Mash tun |
20HL 25% head space, Steam heating with insulation Agitator&motor, Mash outlet |
Lauter tun |
20HL 25% head space, False bottom, Rake&motor, Spent grain outlet CIP, sight glass. |
|
Kettle/Whirlpool tun |
20HL 40% head space, Steam heating with insulation Steam condenser, Tangential inlet Wort outlet and trub outlet |
|
Mash/Wort pump | 5T/hr, Sanitary | |
Plate heat exchanger |
20m2 Two stages Connected with wort aeration device Disassemble |
|
Work platform |
Disassemble, Adjustable |
|
OPTIONAL |
Wort grant Hopback Hopper Pneumatic valve Wort flow meter Sink Sterile air compressor |
|
Fermentation unit |
Fermentation tank |
20HL/40HL 25% head space, Jacketed and insulated Conical bottom, Pressure valve, relief valve CO2 relief valve Coolant inlet and outlet Sample valve Side manway Top, Dry Hopping Port CIP connections Wort inlet and yeast outlet Racking arm Temperature and pressure gauges |
Maturation/Storage (OPTIONL) |
Bright beer tank |
20HL/40HL 20% head space, Jacketed and insulated Dished head&bottom Pressure valve, relief valve Site Glass level Carbonation stone assembly Sample valve Side manway Fill/drainage port CIP connections Temperature and pressure gauges Jacketed and single wall tanks |
Glycol cooling system |
Glycol cooling tank |
Thermowell Top manway CIP arm and spray ball 360 degree of coverage |
Cold liquor tank (OPTIONAL) |
Thermowell Top manway CIP arm and spray ball 360 degree of coverage Visual level sight glass Cooling jackets |
|
Chiller |
Second generation Freon R410A, R404A |
|
Glycol water pump and piping | ||
Controlling unit |
Brewhouse control panel |
Temperature monitoring& controlling Pump on/off control VFD control |
Cellar control panel |
Temperature monitoring& controlling More controllers reversing for expansion available |
|
Cleaning unit |
Alkali tank |
100L Electric heating |
Sterile tank | 100L | |
Pump and piping |
Welcome to send us inquiry for detaield cost of the 20HL Hotel Beer Brewing System!