Hotel Beer Brewing System

8HL HOTEL BEER BREWING SYSTEM

  • Oct 09, 2023
  • 133
  • brewing
 
8HL Hotel Beer Brewing System

Brief introduction

 
Hotel Beer Brewing System is same with bar beer brewing equipment capacity from 200L to 1500L.Some chain hotels may need a bigger capacity.The hotel beer brewing system also have stainless steel or red copper one.Most hotel placed the beer equipment behind of the glass wall,so that visitors could watching the brewing process:Milling, mashing, lauterung, boiling, whirlpool, wort chilling, fermentation&maturing, cooling, temperature controlling, cleaning, filling etc..

 8HL HOTEL BEER BREWING SYSTEM

 8HL HOTEL BEER BREWING SYSTEM


Quick overview of 8HL Hotel Beer Brewing System
 
Output/Brew
 
8HL
 
Brew/day
 
1-2
 
Output/Week
1600L to 8000L beer per week based on different configuration
 
Electric Supply
3phase/380(220, 415,440…)v/50 (60)Hz
Single Phase/ 220(110, 240…)v/50(60)Hz
 
Heating Source
 
Electric/Steam/direct fire heating
 
Area Request
 
>60M2
 
Brewmaster
 
 1
Mashing method Decoction,infusion,multi-step infusion
 
Configuration list for 8HL Hotel Beer Brewing System
 
Main brewing system
 
Components
 
Main specification
 
 
 
 
 
 
Brewhouse unit
 
Mash/Lauter tun   
8HL
25% head space,
Steam heating with insulation
False bottom,
Rake&motor,
Spent grain outlet
CIP, sight glass.
 
 
Kettle/Whirlpool tun
8HL
40% head space,
Steam heating with insulation
Steam condenser,

Tangential inlet.
Wort outlet and trub outlet
Wort pump 3T/hr, Sanitary
 
Plate heat exchanger
8m2
Two stages
Connected with wort aeration device
Disassemble
Work platform Disassemble,
Adjustable
 
 
 
OPTIONAL
Wort grant
Hopback
Hopper
Pneumatic valve
Wort flow meter
Sink
Sterile air compressor
 
Fermentation unit

Fermentation tank
8HL/16HL
25% head space,
Jacketed and insulated
Conical bottom,
Pressure valve, relief valve
CO2 relief valve
Coolant inlet and outlet
Sample valve
Side manway
Top, Dry Hopping Port
CIP connections
Wort inlet and yeast outlet
Racking arm
Temperature and pressure gauges

Maturation/Storage
(OPTIONL)

Bright beer tank
8HL/16HL
20% head space,
Jacketed and insulated
Dished head&bottom
Pressure valve, relief valve
Site Glass level
Carbonation stone assembly
Sample valve
Side manway
Fill/drainage port
CIP connections
Temperature and pressure gauges
Jacketed and single wall tanks

 
Glycol cooling system
 
Glycol cooling tank
Thermowell
Top manway
CIP arm and spray ball 360 degree of coverage
 
 
Cold liquor tank (OPTIONAL)
Thermowell
Top manway
CIP arm and spray ball 360 degree of coverage
Visual level sight glass
Cooling jackets
Chiller Second generation
Freon R410A, R404A
Glycol water pump and piping  

Controlling unit
 
 
Brewhouse control panel
Temperature monitoring& controlling
Pump on/off control
VFD control
 
Cellar control panel
Temperature monitoring& controlling
More controllers reversing for expansion available

Cleaning unit
Alkali tank 100L
Electric heating
Sterile tank 100L
Pump and piping  
 
800L Hotel Beer Brewing System

8HL Hotel Beer Brewing System

Welcome to send us inquiry for detaield cost of the 8HL Hotel Beer Brewing System!
 
Tags : best brewing system    brewing systems   
Request A Quote
Click image to refresh

Get a Quote

Want to start your own brewery now. Just send your idea by email.

or

For faster login or register use your social account.

Connect with Facebook
Request A Quote

Request A Quote

Click image to refresh