Slow Lane Brewing is our fifth customer in 2019 year. The brewery is located in Sydney, Australia.
In Oct.2018 year, Alex sent us the first inquiry about the 10 barrel brewery on website. Then we started the communication about his brewery setup project. It was very pleased communication with him throughout the whole process. He already had more than 10 years brewing experience before he starting the micro brewery.
It took around 3 weeks to get initial agreement on the brewing equipment configuration:
Grain Milling Unit
Flexible Auger
1200L Two Vessel/HLT Brewhouse,direct fire heating
2500L open top fermenter
2500L Bright Beer Tank 2sets
Glycol Chilling Unit
Brewhouse Instrumental Control Cabinet
Fermentation Instrumental Control Cabinet
100L Portable CIP Cart
Then we started the layout design. Because of the tight space, the fermenters were customized to be slimmer and taller than our standard. The layout discussion took around another 3 weeks. During this time, Alex and us exchanged the ideas forth and back, and we modified the drawings until we both think good. It is not complex process. Then in beginning of 2019, we got agreement on the order. Everything was just good and step by step as expected. Oh, we also specially discussed the control panel wire colors, as it is specially requested in Australia.
Alex arranged two times inspection when the manufacturing is close to completion. The inspection was smooth and quick. I still have deep impression on his family, all are very nice and gentle people. :)
If you are not far or just pass by Slow Lane Brewing, try their beautiful beers !
If you have any questions about the brewery setup or brewery equipment, please email us.
Edited by Jana
[email protected]
Tiantai Beer Equipment
In Oct.2018 year, Alex sent us the first inquiry about the 10 barrel brewery on website. Then we started the communication about his brewery setup project. It was very pleased communication with him throughout the whole process. He already had more than 10 years brewing experience before he starting the micro brewery.
It took around 3 weeks to get initial agreement on the brewing equipment configuration:
Grain Milling Unit
Flexible Auger
1200L Two Vessel/HLT Brewhouse,direct fire heating
2500L open top fermenter
2500L Bright Beer Tank 2sets
Glycol Chilling Unit
Brewhouse Instrumental Control Cabinet
Fermentation Instrumental Control Cabinet
100L Portable CIP Cart
Then we started the layout design. Because of the tight space, the fermenters were customized to be slimmer and taller than our standard. The layout discussion took around another 3 weeks. During this time, Alex and us exchanged the ideas forth and back, and we modified the drawings until we both think good. It is not complex process. Then in beginning of 2019, we got agreement on the order. Everything was just good and step by step as expected. Oh, we also specially discussed the control panel wire colors, as it is specially requested in Australia.
Alex arranged two times inspection when the manufacturing is close to completion. The inspection was smooth and quick. I still have deep impression on his family, all are very nice and gentle people. :)
If you are not far or just pass by Slow Lane Brewing, try their beautiful beers !
If you have any questions about the brewery setup or brewery equipment, please email us.