Regional Beer Factory

20000L Regional Beer Factory

  • Mar 02, 2023
  • 126
  • brewing
20000L Regional Beer Factory

Brief introduction


Regional Beer Factory equipment focuses on regional market.The complete setup of these breweries is in compliance with modern brewery standards and specifications. In this beer brewing system, some configurations are different from micro brewery,using SUS304 stainless steel as raw material is the first step to get good quality regional Beer Factory equipment.These products enable systematic execution of milling, mashing, fermentation, filtration, filling and other related processes. And finally their beer is mostly sold to the shelf with bottle or can.

20000L Regional Beer Factory
 

Quick overview of 20000L Regional Beer Factory
 
Output/Brew
20000L
 
Brew/day
 
2-4
 
Output/Week
40HL to 200HL beer per week based on different configuration
 
Electric Supply
3phase/380(220, 415,440…)v/50 (60)Hz
Single Phase/ 220(110, 240…)v/50(60)Hz
 
Heating Source
 
Steam heating
 
Area Request
 
>260M2
 
Brewmaster
 
1-2
Mashing method Decoction,infusion,multi-step infusion
 

Components of 20000L Regional Beer Factory

 
Main brewing system
 
Components
 
Main specification
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Brewhouse unit
 
 
 
Mash/lauter tun              
20000L
25% head space,
Steam heating with insulation
False bottom,
Rake&motor,
Spent grain outlet
CIP, sight glass.
 
 
Kettle/whirlpool tun
20000L
30% head space,
Steam heating with insulation
Steam condenser,
Tangential inlet.
Wort outlet and trub outlet
 
 
Hot liquor tank
20000L
15% head space,
Steam heating with insulation
CIP.
Level gauge
Hot water recycling port
Wort pump 10T/hr, Sanitary
Hot liquor pump 10T/hr, Sanitary
 
Plate heat exchanger
25m2
Two stages
Connected with wort aeration device
Disassemble
Work platform Disassemble,
Adjustable
 
 
 
OPTIONAL
Wort grant
Hopback
Hopper
Pneumatic valve
Wort flow meter
Sink
Sterile air compressor
 
 
 
 
 
 
Fermentation unit
 
 
 
 
 
 
Fermentation tank
20000L/40000L
25% head space,
Jacketed and insulated
Conical bottom,
Pressure valve, relief valve
CO2 relief valve
Coolant inlet and outlet
Sample valve
Side manway
Top, Dry Hopping Port
CIP connections
Wort inlet and yeast outlet
Racking arm
Temperature and pressure gauges
 
 
 
 
 
 
Maturation/Storage
(OPTIONL)
 
 
 
 
 
 
 
Bright beer tank
20000l/40000l 
20% head space,
Jacketed and insulated
Dished head&bottom
Pressure valve, relief valve
Site Glass level
Carbonation stone assembly
Sample valve
Side manway
Fill/drainage port
CIP connections
Temperature and pressure gauges
Jacketed and single wall tanks
 
 
 
 
 
 
 
Glycol cooling system
 
Glycol cooling tank
Thermowell
Top manway
CIP arm and spray ball 360 degree of coverage
 
 
Cold liquor tank (OPTIONAL)
Thermowell
Top manway
CIP arm and spray ball 360 degree of coverage
Visual level sight glass
Cooling jackets
Chiller Second generation
Freon R410A, R404A
Glycol water pump and piping  
 
 
 
 
 
Controlling unit
 
 
Brewhouse control panel
Temperature monitoring& controlling
Pump on/off control
VFD control
 
Cellar control panel
Temperature monitoring& controlling
More controllers reversing for expansion available
 
Cleaning unit
Alkali tank 200L
Electric heating
Sterile tank 200L
Pump and piping  
 
 
Welcome to send us inquiry for detaield cost of the 20000L Regional Beer Factory

 
Tags : brewing equiptment    craft beer factory   
Request A Quote
Click image to refresh

Get a Quote

Want to start your own brewery now. Just send your idea by email.

or

For faster login or register use your social account.

Connect with Facebook
Request A Quote

Request A Quote

Click image to refresh