10HL HOTEL BEER BREWING SYSTEM

Hotel Beer Brewing System brewing

 
10HL Hotel Beer Brewing System

Brief introduction

 
Hotel Beer Brewing System is same with bar beer brewing equipment capacity from 200L to 1500L.Some chain hotels may need a bigger capacity.The hotel beer brewing system also have stainless steel or red copper one.Most hotel placed the beer equipment behind of the glass wall,so that visitors could watching the brewing process:Milling, mashing, lauterung, boiling, whirlpool, wort chilling, fermentation&maturing, cooling, temperature controlling, cleaning, filling etc..




Quick overview of 10HL Hotel Beer Brewing System

 
Output/Brew
 
10HL
 
Brew/day
 
1-2
 
Output/Week
20HL to 100HL beer per week based on different configuration
 
Electric Supply
3phase/380(220, 415,440…)v/50 (60)Hz
Single Phase/ 220(110, 240…)v/50(60)Hz
 
Heating Source
 
Electric/Steam/direct fire heating
 
Area Request
 
>60M2
 
Brewmaster
 
 1
Mashing method Decoction,infusion,multi-step infusion
 
Configuration list for 10HL Hotel Beer Brewing System
 
Main brewing system
 
Components
 
Main specification
 
 
 
 
 
 
Brewhouse unit
 
Mash/lauter /whirlpool tun   
10HL
25% head space,
Steam heating with insulation
False bottom,
Rake&motor,
Spent grain outlet
CIP, sight glass.
Tangential inlet.
 
 
Kettle tun
10HL
30% head space,
Steam heating with insulation
Steam condenser,
Wort outlet and trub outlet
Wort pump 3T/hr, Sanitary
 
Plate heat exchanger
8m2
Two stages
Connected with wort aeration device
Disassemble
Work platform Disassemble,
Adjustable
 
 
 
OPTIONAL
Wort grant
Hopback
Hopper
Pneumatic valve
Wort flow meter
Sink
Sterile air compressor
 
Fermentation unit

Fermentation tank
10HL/20HL
25% head space,
Jacketed and insulated
Conical bottom,
Pressure valve, relief valve
CO2 relief valve
Coolant inlet and outlet
Sample valve
Side manway
Top, Dry Hopping Port
CIP connections
Wort inlet and yeast outlet
Racking arm
Temperature and pressure gauges

Maturation/Storage
(OPTIONL)

Bright beer tank
10HL/20HL
20% head space,
Jacketed and insulated
Dished head&bottom
Pressure valve, relief valve
Site Glass level
Carbonation stone assembly
Sample valve
Side manway
Fill/drainage port
CIP connections
Temperature and pressure gauges
Jacketed and single wall tanks

 
Glycol cooling system
 
Glycol cooling tank
Thermowell
Top manway
CIP arm and spray ball 360 degree of coverage
 
 
Cold liquor tank (OPTIONAL)
Thermowell
Top manway
CIP arm and spray ball 360 degree of coverage
Visual level sight glass
Cooling jackets
Chiller Second generation
Freon R410A, R404A
Glycol water pump and piping  

Controlling unit
 
 
Brewhouse control panel
Temperature monitoring& controlling
Pump on/off control
VFD control
 
Cellar control panel
Temperature monitoring& controlling
More controllers reversing for expansion available

Cleaning unit
Alkali tank 100L
Electric heating
Sterile tank 100L
Pump and piping  
 
 
 
 
Welcome to send us inquiry for detaield cost of the 10HL Hotel Beer Brewing System!

 
 
 
 
 
 
 
 
 
 
 
 
 




For professional brewery solution and exactly quotation, please feel free to send inquiry below.

Name

Email

Tel

shijian

tijiaoye

ip


Messagge


Click image to refresh

News

18-06-13
20000L Jacketed conical fermenter

20000L Jacketed conical fermenter Brief introduction Thejacketed conical fermenter isdefined as a standard in the whole micro brewery area.Conical bottom is conv ...

18-05-11
40bbl Industrial Brewery Equipment

40bblIndustrial Brewery Equipment Brief introduction Industry brewery equipment capacity is a little larger than microbrewery equipment.The output is mainly 150H ...

18-04-26
12HL Restaurant Beer Brewing Equipment

12 HL Restaurant Beer Brewing Equipment Brief introduction Restaurant equipment for beer brewing is usually not complex, compared with the commercial or independ ...

Reference