150HL Regional Beer Factory
- Jul 13, 2025
- 144
- brewing
150HL Regional Beer Factory
Brief introduction
Regional Beer Factory equipment focuses on regional market.The complete setup of these breweries is in compliance with modern brewery standards and specifications. In this beer brewing system, some configurations are different from micro brewery,using SUS304 stainless steel as raw material is the first step to get good quality regional Beer Factory equipment.These products enable systematic execution of milling, mashing, fermentation, filtration, filling and other related processes. And finally their beer is mostly sold to the shelf with bottle or can.
Quick overview of 150HL Regional Beer Factory
Welcome to send us inquiry for detaield cost of the 150HL Regional Beer Factory
Brief introduction
Regional Beer Factory equipment focuses on regional market.The complete setup of these breweries is in compliance with modern brewery standards and specifications. In this beer brewing system, some configurations are different from micro brewery,using SUS304 stainless steel as raw material is the first step to get good quality regional Beer Factory equipment.These products enable systematic execution of milling, mashing, fermentation, filtration, filling and other related processes. And finally their beer is mostly sold to the shelf with bottle or can.
Quick overview of 150HL Regional Beer Factory
Output/Brew |
150HL |
Brew/day |
2-4 |
Output/Week |
30HL to 150HL beer per week based on different configuration |
Electric Supply |
3phase/380(220, 415,440…)v/50 (60)Hz Single Phase/ 220(110, 240…)v/50(60)Hz |
Heating Source |
Steam heating |
Area Request |
>260M2 |
Brewmaster |
1-2 |
Mashing method | Decoction,infusion,multi-step infusion |
Components of 150HL Regional Beer Factory
Main brewing system |
Components |
Main specification |
Brewhouse unit |
Mash/lauter tun |
150HL 25% head space, Steam heating with insulation False bottom, Rake&motor, Spent grain outlet CIP, sight glass. |
Kettle/whirlpool tun |
150HL 30% head space, Steam heating with insulation Steam condenser, Tangential inlet. Wort outlet and trub outlet |
|
Hot liquor tank |
300HL 15% head space, Steam heating with insulation CIP. Level gauge Hot water recycling port |
|
Wort pump | 10T/hr, Sanitary | |
Hot liquor pump | 10T/hr, Sanitary | |
Plate heat exchanger |
150m2 Two stages Connected with wort aeration device Disassemble |
|
Work platform |
Disassemble, Adjustable |
|
OPTIONAL |
Wort grant Hopback Hopper Pneumatic valve Wort flow meter Sink Sterile air compressor |
|
Fermentation unit |
Fermentation tank |
150HL/300HL 25% head space, Jacketed and insulated Conical bottom, Pressure valve, relief valve CO2 relief valve Coolant inlet and outlet Sample valve Side manway Top, Dry Hopping Port CIP connections Wort inlet and yeast outlet Racking arm Temperature and pressure gauges |
Maturation/Storage (OPTIONL) |
Bright beer tank |
150Hl/300Hl 20% head space, Jacketed and insulated Dished head&bottom Pressure valve, relief valve Site Glass level Carbonation stone assembly Sample valve Side manway Fill/drainage port CIP connections Temperature and pressure gauges Jacketed and single wall tanks |
Glycol cooling system |
Glycol cooling tank |
Thermowell Top manway CIP arm and spray ball 360 degree of coverage |
Cold liquor tank (OPTIONAL) |
Thermowell Top manway CIP arm and spray ball 360 degree of coverage Visual level sight glass Cooling jackets |
|
Chiller |
Second generation Freon R410A, R404A |
|
Glycol water pump and piping | ||
Controlling unit |
Brewhouse control panel |
Temperature monitoring& controlling Pump on/off control VFD control |
Cellar control panel |
Temperature monitoring& controlling More controllers reversing for expansion available |
|
Cleaning unit |
Alkali tank |
1000L Electric heating |
Sterile tank | 1000L | |
Pump and piping |
Welcome to send us inquiry for detaield cost of the 150HL Regional Beer Factory