1200L Hotel Beer Brewing System
- Jun 06, 2024
- 150
- brewing
1200L Hotel Beer Brewing System
Brief introduction
Hotel complete beer brewing system is same as bar brewing systems with capacity from 200L to 1500L. Some chain hotels might need a bigger capacity. The brewhouse of hotel beer brewing system can be made from stainless steel or red copper. The small batch brewing systems can be put behind of the glass wall, so that visitors can watch the whole brewing process.
The brewing process include: milling, mashing, lauterung, boiling, whirlpool, wort chilling, fermentation&maturing, fermentation cooling, cleaning, filling etc.
Quick overview of 1200L Small Beer Brewing System
Output/Brew |
1200L |
Brew/day |
1-2 |
Output/Week |
2400L to 12000L beer per week based on different configuration |
Electric Supply |
3phase/380(220, 415,440…)v/50 (60)Hz Single Phase/ 220(110, 240…)v/50(60)Hz |
Heating Source |
Electric/Steam/direct fire heating |
Area Request |
>60M2 |
Brewmaster |
1 |
Mashing method | Decoction,infusion,multi-step infusion |
Configuration list for 1200L Small Beer Brewing System
Main brewing system |
Components |
Main specification |
Brewhouse unit |
Mash/Lauter tun |
1200L 25% head space, Steam heating with insulation False bottom, Rake&motor, Spent grain outlet |
Kettle tun |
1200L 40% head space, Steam heating with insulation Steam condenser, Wort outlet and trub outlet |
|
Whirlpool tun |
1200L 25% head space, CIP, sight glass. Tangential inlet. |
|
Wort pump | 5T/hr, Sanitary | |
Plate heat exchanger |
12m2 Two stages Connected with wort aeration device Disassemble |
|
Work platform |
Disassemble, Adjustable |
|
OPTIONAL |
Wort grant Hopback Hopper Pneumatic valve Wort flow meter Sink Sterile air compressor |
|
Fermentation unit |
Fermentation tank |
1200L/2400L 25% head space, Jacketed and insulated Conical bottom, Pressure valve, relief valve CO2 relief valve Coolant inlet and outlet Sample valve Side manway Top, Dry Hopping Port CIP connections Wort inlet and yeast outlet Racking arm Temperature and pressure gauges |
Maturation/Storage (OPTIONL) |
Bright beer tank |
1200L/2400L 20% head space, Jacketed and insulated Dished head&bottom Pressure valve, relief valve Site Glass level Carbonation stone assembly Sample valve Side manway Fill/drainage port CIP connections Temperature and pressure gauges Jacketed and single wall tanks |
Glycol cooling system |
Glycol cooling tank |
Thermowell Top manway CIP arm and spray ball 360 degree of coverage |
Cold liquor tank (OPTIONAL) |
Thermowell Top manway CIP arm and spray ball 360 degree of coverage Visual level sight glass Cooling jackets |
|
Chiller |
Second generation Freon R410A, R404A |
|
Glycol water pump and piping | ||
Controlling unit |
Brewhouse control panel |
Temperature monitoring& controlling Pump on/off control VFD control |
Cellar control panel |
Temperature monitoring& controlling More controllers reversing for expansion available |
|
Cleaning unit |
Alkali tank |
100L Electric heating |
Sterile tank | 100L | |
Pump and piping |
Welcome to send us inquiry for detaield information and cost of the 1200L Hotel Beer Brewing System!